We have a half story upstairs. We are fortunate because someone already made 2 spacious closets up there, there's electrical run, HVAC is there, and there are walls and a ceiling.
The paneling walls don't bother me too much, but there was an awful acoustic ceiling and one (1!!) light upstairs.
Guy and I decided to rip down the acoustic tile, and add a cubby (see the wall on the right? There's nothing back there but paneled-over empty space, so we cut in a door, and we can squeeze about 6 large totes in there.) Also we added dimmable LED recessed light, which I love.
We started this at the beginning of February, and since it's hot in the summer, we went to Cedar Point instead.
We are back at it and we have 100% of the drywall hung (never again), and we are in between finishing mudding and starting sanding.
Then it's paint, trim, and rip up the carpet.
In the meantime, here are some photos of our progress.
Showing posts with label ceiling. Show all posts
Showing posts with label ceiling. Show all posts
Thursday, November 17, 2016
Sunday, February 15, 2015
Sunday Vaseline
We're taking the kitchen remodel slowly.
Guy and I spent the past hour trying to run Romex for a new outlet to go behind the refrigerator. Finally we accomplished this with a fish tape, pliers, electrical tape, and gobs of Vaseline.
Here's some photos of the progress and a bonus... the little trinkets we found while ripping the vent soffit down!
Guy and I spent the past hour trying to run Romex for a new outlet to go behind the refrigerator. Finally we accomplished this with a fish tape, pliers, electrical tape, and gobs of Vaseline.
Here's some photos of the progress and a bonus... the little trinkets we found while ripping the vent soffit down!
![]() |
| Hole cleaned up |
Subscribe to:
Posts (Atom)

